5-star resort hotels host 2,000+ beds + 8 restaurants + 5,000+ covers/day. The kitchen hood collects grease fumes. NFPA 96 requires cleaning access in horizontal grease ducts, protection of the cooking equipment by an automatic extinguishing system complying with UL 300 or an equivalent standard, and fuel and power shut-off when it operates.
Hood Design
- Type I: Grease, high heat
- Type II: Steam, heat
- Size: The hood is sized to capture and remove grease-laden vapors (clause 5.2)
- Exhaust airflow: Must be sufficient to capture and remove grease-laden vapors (clause 8.2.2)
- Filter: Listed, noncombustible, rigid; installed at least 45 degrees from horizontal (clause 6.2.3)
Grease Duct
- Velocity: not less than 152.4 m/min (500 ft/min, about 2.54 m/s) (clause 8.2.1.1)
- Slope: at least 2 percent on horizontal runs up to 22.86 m (75 ft), at least 8 percent beyond (clause 7.1.4)
- Material: Carbon steel not less than 1.52 mm (No. 16 MSG) or stainless steel not less than 1.21 mm (No. 18 MSG) (clause 7.5.1.1)
- Clean-out: At least one 508x508 mm personnel-entry opening on horizontal ducts; where not possible, openings at 3.7 m (12 ft) intervals (clause 7.4.1)
- Clearance: 457 mm (18 in.) to combustible, 76 mm to limited-combustible, 0 mm to noncombustible material (clause 4.2.1)
UL 300 Wet Chemical
- Standard: The automatic extinguishing system complies with UL 300 or an equivalent standard and is installed per its listing (clause 10.2.3)
- Protected items: Cooking equipment, grease filters, hood plenum and exhaust duct (clauses 10.1.1, 10.1.2)
- Manual actuation: A manual means of actuation in addition to automatic (clause 10.5.1)
- Fuel shut-off: On activation all fuel and electric power sources to the cooking equipment are shut off; shut-off devices need manual reset (clauses 10.4.1, 10.4.4)
- Annunciation: An audible alarm or visual indicator shows that the system has activated (clause 10.6.1)
Inspection
- Grease-buildup inspection (Table 11.4): every 3 months for high-volume (24-hour, charbroil, wok) cooking, every 6 months for moderate volume, monthly for solid fuel
- Annual: Low-volume operations are inspected once a year (Table 11.4)
- Fusible link: Metal-alloy type replaced at least semiannually (clause 11.2.4)
- Actuation components: All actuation and control components, including remote manual pull stations, are tested for proper operation at each inspection (clause 11.2.2)
- System maintenance: At least every 6 months by properly trained, qualified and certified persons (clause 11.2.1)
Portable Extinguishers
- Class K extinguisher: provided where vegetable or animal oil and fat cooking hazards exist (clause 10.9.2)
- CO2 extinguisher: Portable carbon dioxide extinguishers are not permitted in cooking areas (clause 10.9.4)

MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations (sprinkler, fire pump, clean agent) plus heating, cooling, HVAC, plumbing, steam and natural gas. Download it on the App Store.
Download MEP Calc on the App Store
SprinkCalc — Fire Sprinkler Design Across Three Standards
SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report. One of the few tools that unifies all three major fire protection standards.
Download SprinkCalc on the App StoreNFPA 96, UL 300, IMC Ch. 5, ASHRAE 154, NSF 2. NFPA 96 Ventilation Control and Fire Protection of Commercial Cooking.