LNG (-162 °C methane) storage tanks are designed per NFPA 59A and EN 1473 for fire and BLEVE risk. Full containment tanks use 9 percent Ni steel inner and pre-stressed concrete outer wall to contain leaks and radiation. FSRU, LNG terminals and peak-shaver plants follow the same principles.

Tank Types

  • Single containment: single wall + external bund - legacy design
  • Double containment: two tanks, outer holds liquid only
  • Full containment: outer tank holds both liquid and vapor (modern)
  • Membrane: Invar wall + concrete shell
  • Cover: concrete dome - radiation shield

BLEVE and RPT Risk

  • BLEVE: pressurized liquid explosion - low for atmospheric LNG
  • RPT (Rapid Phase Transition): LNG-water contact - physical explosion
  • Pool fire: liquid pool fire - SEP 220 kW/m2
  • Flash fire: vapor-cloud ignition - low overpressure
  • Rollover: sudden breakdown of stratification causing rapid vaporization

Impoundment Area

180,000 m3 tank; NFPA 59A 13.1 sets impoundment at 110 percent of maximum liquid capacity for one container, or 100 percent if designed for dynamic surge or if the wall is at least as high as the maximum liquid level:

  • Concrete bund height: per liquid volume
  • Bund-to-tank distance: for containers designed below 15 psi (103 kPa), per NFPA 59A Figure 13.11 (X at least Y plus the LNG head equivalent to vapor pressure; free if the bund is at least as high as the maximum liquid level)
  • Insulating concrete: -162 °C durability
  • Drainage: rainwater drain auto-valve
  • Vapor fence: height and details per the dispersion analysis

Firewater System

  • Deluge: tank shell 10.2 L/min/m2 (NFPA 15)
  • High-expansion foam: per NFPA 11-2024 A.7.14, expansions of 750:1–1000:1 are most effective for vapor dispersion control and about 500:1 for fire control; design is based on a site-specific analysis (7.14.1.1)
  • Monitor: fixed water monitors; capacity and range per the hazard analysis
  • Dry chemical: for methane jet fires; quantity set by the hazard analysis
  • Water pond: firewater reservoir; volume follows from the duration and flow calculation

Vapor Cloud Analysis

  • Dispersion: PHAST, FLACS CFD modeling
  • LFL: 5 percent (50,000 ppm)
  • Hazard distance: 1/2 LFL boundary
  • Exclusion zone: per NFPA 59A 5.3.2.9 the design-spill vapor dispersion must not extend beyond the property line that can be built upon
  • Flammable vapor fence: delay and dilution

MEP Calc — 110+ Engineering Calculators

MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations (sprinkler, fire pump, clean agent) plus heating, cooling, HVAC, plumbing, steam and natural gas. Download it on the App Store.

Download MEP Calc on the App Store

SprinkCalc — Fire Sprinkler Design Across Three Standards

SprinkCalc covers hazard classification, design density and area, K-factor selection, water demand and hydraulic calculations for NFPA 13, FM Global and BS EN 12845 in a single iOS app, and exports a professional PDF report. One of the few tools that unifies all three major fire protection standards.

Download SprinkCalc on the App Store
Sources & Further Reading