What are in-rack sprinklers and when are they needed?
In-rack (intermediate level) sprinklers are fitted inside the rack structure, in the flue spaces between loads, where the water from the ceiling sprinklers cannot reach the lower tiers of high-bay storage. All three standards place them at the intersections of transverse and longitudinal flues; the number of levels depends on storage height, tier height and commodity. This tool calculates the layout; the ceiling design, pipe sizes and hydraulic calculation are done separately.
EN 12845: the 3.50 m rule and clause 12.5
- Vertical (12.5.2): floor to the lowest level and between levels at most 3.50 m or two tiers, whichever is less. The highest level may not be more than one tier below the top of storage. Unless all ceiling sprinklers are less than 4 m above the top of storage, a level is also placed above the storage.
- Horizontal (12.5.3): Categories I–II in the longitudinal flue, where possible at every second transverse flue intersection, staggered against the row above; spacing at most 3.75 m and horizontal × vertical at most 9.8 m². Categories III–IV at every transverse flue; at most 1.9 m and 4.9 m².
- Rows (12.5.4, 12.5.5): one row per 3.2 m of total rack width; two rows between 3.2 and 6.4 m, equidistant from the edges.
- Shelving ST5/ST6 (12.5.6, Table 21): above every shelf; at most 2.8 m along the row, two rows for 3.0–6.0 m width.
- Sprinklers: K80 or K115 (Table 37a), quick response (Table 38), metal water shield at least 75 mm in diameter (14.7). The design takes 3 sprinklers per level, up to 3 levels; the number of racks involved depends on the aisle width (7.2.3.3).
FM DS 8-9: IRAS(E) and IRAS(EO)
FM Global selects the horizontal arrangement with the flowcharts in Figs. 5, 5a, 6, 6a and 7. The decision depends on:
- rack type and depth;
- whether the deflector is closer than 150 mm to the load below;
- horizontal barriers;
- solid shelf area;
- whether storage exceeds 7.5 m (25 ft), and the 7.5 m and 9.0 m ceiling heights;
- the commodity.
IRAS(EO) places sprinklers at every other transverse flue, 1.2–3.0 m apart; IRAS(E) at every transverse flue, 0.6–2.4 m apart. The vertical increment follows Fig. 15 by commodity: 7.5, 6.0, 4.5 or 3.0 m, with at most 3.0 m of storage above the top level. In-rack sprinklers are FM Approved, quick response, 70 °C nominal (2.3.4.3). The design comes from Table 12 and the ceiling protection table from Table 13.
NFPA 13-2025: Chapter 25 figures
NFPA 13 gives in-rack arrangements combined with CMDA ceiling sprinklers as figures by commodity and height (25.4.2).
- Levels: for Class I–IV stored 3.7–7.6 m high in single- and double-row racks, one level is required. It goes at the first tier level at or above half the storage height (25.1.8.1); for two levels, one-third and two-thirds are used (25.1.8.2).
- Spacing along the rack: read from the figure. It is 3.7 m for exposed Class I–II, 3.0 m for Class IV and 2.4 m for encapsulated or cartoned commodities.
- Multiple-row racks: the plan area per sprinkler is limited to 9.3 m² (7.4 m² for Class IV).
- Group A plastics: the figures also limit the largest vertical spacing and the storage above the top level.
- Solid shelves: Section 25.3 applies.
- Sprinklers: ordinary temperature, standard or quick response, at least K5.6 (K80). Without horizontal barriers they need water shields (25.1.6).
- Design: the values are in Table 25.4.1.1.
- Over 7.6 m: the 25.4.3 figures limit the largest vertical spacing and the storage above the top level, mostly to 3.0 m. In double- and multiple-row racks most arrangements also need face sprinklers at the aisle faces; the tool leaves their positions to the figure and gives its page number.
Clearance rule: up to 7.6 m of storage, where the clearance exceeds 6.1 m for Class I–IV or 3.0 m for Group A, either the ceiling design uses a theoretical storage height or a level is added directly below the top tier. Above 7.6 m of storage, a clearance over 3.0 m makes that extra level mandatory; the tool adds it at every flue intersection.
NFPA 13: with CMSA and ESFR ceilings (25.5, 25.6)
- CMSA (Figure 25.5.1.1): one level, at the nearest tier level at or above half the storage height. Class I–IV up to 7.6 m: 2.4 m spacing; Group A and Class I–II at 7.6–9.1 m: 1.5 m. Ceiling at most 10.7 m. In-rack design Table 25.5.1.3 (8 sprinklers × 83 L/min in open racks), ceiling design Table 25.5.2.1.
- ESFR (Figure 25.6.2.1): one level, 1.5 m spacing; storage up to 12.2 m under a 13.7 m ceiling. In-rack sprinklers quick response, at least K115 (25.6.1.2). Design Table 25.6.2.3 (8 × 230 L/min in open racks), ceiling Table 25.6.3.1 (12 ESFR, 6.2 bar for K200, 4.3 bar for K240).
- Solid shelves: with CMSA and ESFR, all tiers under the highest solid shelf (25.3.3.3, 25.3.3.4).
- Both ceiling tables cover only nonexpanded Group A plastics.
NFPA 13: options independent of the ceiling (25.7)
For closed-top Class I–IV and Group A plastics the in-rack system is designed independently of the ceiling; the top in-rack level counts as the floor for the ceiling design (25.7.3.2.1).
- Option 1: at least K115, quick response; levels at most 3.7 m apart with a horizontal barrier above each. Single-row 1.5 m; double-row 1.5 m at the faces and 3.0 m in the longitudinal flue.
- Option 2a / 2b: pendent ESFR, at least K200 / K320; levels at most 9.1 m / 12.2 m (9.1 m for expanded and exposed Group A under 2b; 2a does not permit exposed Group A). Spacing 1.4 m; 2.6 m at double-row faces where transverse flues are at most 1.3 m apart.
- Option 3: K360 extended coverage, intermediate temperature; levels at most 9.1 m (6.1 m for exposed Group A), with barriers. Spacing 3.0 m; in double-row racks only in the longitudinal flue.
- Design: Table 25.7.3.1, regardless of the number of levels. In-rack sprinklers at least 700 mm apart (25.7.2.3.2).
NFPA 13: rubber tires (25.4.2.5)
Rubber tires on pallets, on-side or on-tread, stored over 3.7 m and up to 6.1 m are protected per Figure 25.4.2.5.1(a) and (b), in a building (ceiling) up to 9.1 m. In-rack layouts are given only with CMDA ceilings.
- Vertical: one level at the tier level closest to and at least 50% of the storage height.
- Horizontal: at most 2.4 m; in the transverse flue for single-row, in the longitudinal flue for double-row; in multiple-row racks lines at most 2.4 m apart across the depth and at most 5.9 m² per sprinkler.
- Design: 12 in-rack sprinklers × 114 L/min (figure note and Table 25.4.1.1); ceiling 16.3 mm/min over 280 m², or 9.8 mm/min over 280 m² when supplemented with high-expansion foam.
- Clearance: more than 3.0 m from the top of storage to the ceiling needs a theoretical storage height or a quick-response level below the top tier (25.4.2.5.2.2).
FM DS 8-9: special applications (2.3.6)
In the “Design route” step, the in-rack options of 2.3.6 can replace the standard 2.3.4 layout. Each comes with its own commodity, rack and ceiling conditions; where they are not met the tool says out of scope.
- 2.3.6.3: Class 1–4 and cartoned plastics, single- and double-row (up to 2.7 m), longitudinal flue only. Option 1 at every transverse flue (Figs. 11/12), option 2 every other flue, staggered (Figs. 8/9), with all intersections at vertical increments of at most 7.2 m. Levels at most 3.6 m, at most 3.0 m above the top level; design per Tables 12 and 13.
- 2.3.6.4: longitudinal line at most 1.5 m along the rack, levels at most 3.6 m; horizontal barriers above the lowest level and at every other level. Also covers uncartoned unexpanded plastics.
- 2.3.6.5: with at least K200 quick-response pendent ceiling sprinklers, a single level under ceilings up to 13.5 m; the level at one-half to two-thirds of the storage height, design 8 most remote sprinklers × 230 L/min.
- 2.3.6.6: alternative design for all commodities: pendent storage sprinklers (at least K320; K200 up to 380 L/min), Figs. 19a–21, sprinklers 0.7–1.4 m apart. Levels at most 9.0 m (cartoned expanded and uncartoned plastics) or 12 m; number from Table 15, flow from Table 16. The ceiling is designed with the top level as the floor (Fig. 22).
- 2.3.6.7: retrofit; new face sprinklers where one longitudinal line is not enough (at least K320, 455 L/min from the most remote), levels at most 9.0 m, at most 1.5 m above; number from Table 17.
- 2.3.6.8: Class 1–4 and cartoned unexpanded plastics, K25.2EC (K360EC) pendents under horizontal barriers at every level; 2.1–2.5 m along the rack, levels at most 9.0 m, 605 L/min from the most remote; number from Table 17a.
2.3.6.1 and 2.3.6.9 are ceiling-only protection and 2.3.6.2 sets when retail racks count as open-frame. They contain no in-rack layout, so they are not in the tool.
Frequently Asked Questions
What is the maximum vertical distance between in-rack levels in EN 12845?
Under clause 12.5.2, floor to the lowest level and between levels at most 3.50 m or two tiers, whichever is less. The highest level may not be more than one tier below the top of storage.
Is a level needed above the top of storage?
In EN 12845 not if all ceiling sprinklers are less than 4 m above the storage; otherwise yes (12.5.2). In FM DS 8-9 at most 3.0 m of storage may remain above the top level (Fig. 15).
What is the difference between IRAS(E) and IRAS(EO) in FM DS 8-9?
IRAS(EO) puts sprinklers at every other transverse flue intersection (1.2–3.0 m), IRAS(E) at every transverse flue intersection (0.6–2.4 m). The flowcharts in Figs. 5–7 decide which is acceptable.
Where does a single in-rack level go in NFPA 13?
Where the figure does not show it, at the first tier level at or above half the storage height (25.1.8.1). For two levels, one-third and two-thirds are used (25.1.8.2).
What are the ceiling-independent in-rack options in NFPA 13 (25.7)?
Four options where the in-rack system is designed independently of the ceiling sprinklers: Option 1 (K115, with barriers, 3.7 m), 2a and 2b (ESFR K200 and K320; 9.1 and 12.2 m) and 3 (K360 extended coverage, with barriers, 9.1 m). The top in-rack level counts as the floor for the ceiling design (25.7.3.2.1).
How are in-rack sprinklers arranged for rack storage of rubber tires in NFPA 13?
For palletized tires stored over 3.7 m and up to 6.1 m (Figure 25.4.2.5.1), one level goes at the tier level at or above half the storage height, with sprinklers at most 2.4 m apart. Design 12 sprinklers × 114 L/min; ceiling 16.3 mm/min over 280 m² (9.8 mm/min with high-expansion foam); building at most 9.1 m.
What is the FM DS 8-9 alternative in-rack design (2.3.6.6)?
As an alternative to the 2.3.4 layouts, pendent quick-response storage sprinklers (at least K320; K200 where the flow is 380 L/min or less) are used in the rack 0.7–1.4 m apart. Levels at most 9.0 m apart, or 12 m for Class 1–4 and cartoned unexpanded plastics; the ceiling is designed with the top level as the floor. The number of sprinklers comes from Table 15 and the most remote flow from Table 16.

MEP Calc — 110+ Engineering Calculators
MEP Calc bundles 110+ engineering modules in one iOS app: 21 fire calculations plus heating, cooling, HVAC, plumbing, steam and natural gas.
Download MEP Calc on the App Store
SprinkCalc — Fire Sprinkler Design in Three Standards
Run these calculations on site, offline and with PDF reports: NFPA 13, FM Global and BS EN 12845 in one iOS app.
Get SprinkCalc on the App Store